+20 1281015604
Anti-Corrosion & Protective Coatings

The Suez Steel Factory Project

Attaka, Suez, Egypt2021
The Suez Steel Factory Project
01 / 01Main Cover

The Engineering Challenge

Executing specialized contracting works conforming to strict project standards and schedule milestones.

Scope of Work

Execution of specialized scope in partnership with Al-Rowad Company / شركة الرواد للمقاولات matching engineering standards.

Technical Solution & Specified Systems

Application of manufacturer-approved systems and specialized membranes with strict QA/QC sign-off.

Project Facts

Main Contractor:Al-Rowad Company / شركة الرواد للمقاولات
Location:Attaka, Suez, Egypt
Year of Completion:2021

Have Similar Engineering Requirements?

Our engineering consultants are available for site inspections, specification reviews, and comprehensive RFQ pricing.

Request RFQ Online

Related Case Studies

View all
Military Factory 27, Al-Zawamel Road
Al-Zawamel Road, Sharqia, Egypt
2021Contracted

Contractor: Arab Contractors / شركة المقاولون العرب

Military Factory 27, Al-Zawamel Road

Consultant: Dar Al-Handasah Office / مكتب دار الهندسة

Anti-corrosion protective coatings, chemical-resistant barrier liners, and structural concrete sealing.

Anti-Corrosion & Protective Coatings